Q3 2020 Photo Gallery PDF Desalination plant pre-treatment building and reverse osmosis plant concrete installation, August 2020 Placement of reverse osmosis modules at desalination plant, August 2020 Electrical substation in infrastructure area, August 2020 Structural steel in the concentrator grinding building, August 2020 Installation of SAG #1 endcover, July 2020 650m³ rougher flotation cells at concentrator, August 2020 Installation of concentrator SAG #1 discharge trunnion, August 2020 Concentrator mill foundations and structural steel, August 2020 Water pipeline string and welding, August 2020 Powerline tunnel boring for underground crossing, August 2020